CDOT NHPP 1601-073 Passing Lanes North of Towaoc

Project Type

Asphalt

Construction

Location

Towaoc

Owner: CDOT
General Contractor: Four Corners Materials
Subcontractors or Key Contractors: Weeminuche Construction Authority (waterline)
Materials Used on Project and Quantities:

  • 9’ x 5’ Concrete Box Culvert 130’ long
  • 18,090 Tons of HMA

The team reconstructed two miles of US Hwy 160. The project consisted of widening the road and adding passing and turning lanes. There were several RCP crossings, a 48” slip line, and a 9’x5’ CBC. Also, part of the project included 10,462 feet of new 16” water line for the town of Toawac.

 

"It was great to be a part of such a great team that puts safety and quality at the front."

Paul McGee - Estimator/Project Manager

Four Corners Materials

Request a Quote