US Hwy 160 Hawkins St. Signal and Curb Ramps Cortez

Project Type

Aggregates

Construction

Location

Cortez

Owner: CDOT Colorado Department of Transportation
General Contractor: Oldcastle SW Group, Inc./Four Corners Materials
Subcontractors or Key Contractors: Goff Engineering & Surveying, Western Gravel Construction, Horizon Environmental Services, Alert Traffic Control, and TY Striping
Materials Used on Project and Quantities:

  • Base Course Gravel – 500 tons
  • Concrete Pavement (Fast Track) – 100 CY
  • ADA Compliant Concrete Sidewalk/Curb & Gutter – 200 CY
  • Electrical Conduit – 2,000 LF
  • Signal Poles (40 Ft. avg.) – 4

Four Corners Materials crews removed the existing sidewalk, curb, and gutter and replaced them with new ADA compliant sidewalks, ramps, and curbs. Additionally, crews installed a new traffic signal at the intersection of US Hwy 160 and Hawkins Street at the east end of Cortez, CO.

 

"Great job - Project crew had a learning curve at the beginning and was able to complete the project safely, on time, and within budget."

Steve Folk, PE, Project Engineer

Bechtolt Engineering, Inc. – Consultant Engineer for CDOT